search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber – Summary For Monday 18 June To Sunday 24 June 2018
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 15 June and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M18 junction 2 to junction 3 St Catherines

The northbound carriageway will be fully closed overnight for two nights from Monday 18 June for carriageway repairs. The closures will take place between 9pm and 6am and drivers will follow a clearly signed diversion route.

M1 junction 30 Barlborough

The northbound entry slip road at junction 30 will be closed overnight on Tuesday 19 June for technology work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M1 junction 33 Catcliffe

The southbound entry slip road at junction 33 will be fully closed overnight with single lane running on Wednesday 20 June for technology work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M1 junction 34 Tinsley

The southbound entry slip road at junction 34 will be fully closed overnight on Monday 18 June for technology work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M1 junction 41 Carrgate

The southbound entry slip road will be closed overnight on Monday 18 June for technology repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M1 junction 42 Lofthouse

The southbound entry slip road will be closed overnight on Thursday 21 June for technology repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M62 junction 34 to junction 36 Airmyn

The westbound carriageway will be fully closed overnight for six nights from Monday 18 June for carriageway work. The closure will take place from 8pm to 6am, and drivers will be able to follow clearly-signed diversion routes.

M62 junction 32a Holmefield

The A1M junction 41 southbound link road to M62 eastbound will be fully closed overnight for five nights from Monday 18 June for barrier work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M621 junction 27 Gildersome

The westbound carriageway will be fully closed between the slip roads overnight for seven nights from Monday 18 June for barrier work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M621 junction 1 Beeston to junction 7 Stourton

The clockwise carriageway will be fully closed overnight for five nights from Monday 18 June. The clockwise and anticlockwise will be in narrow lanes with 30mph speed restriction till July 2018 for carriageway improvement work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

M180 junction 1 to junction 2 Woodhouse

The eastbound carriageway will be fully closed overnight on Monday 18 June for carriageway repairs and VRS. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes. The eastbound and westbound carriageway has a 50mph speed restriction and narrow lanes with lane 3 closed in place till December 2018 for barrier work. The speed restriction is in place 24/7.

A64 Tadcaster to Bilborough

The eastbound and westbound carriageway has a 40mph speed restriction in place for barrier renewal work. The speed restriction is in place 24/7. The overall scheme is due to be completed in summer.

A180 Brocklesby to Barnetby

The westbound carriageway will be fully closed overnight for three nights from Tuesday 19 June for carriageway repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

A180 Stallingbrough to Brocklesby

The westbound carriageway will be fully closed overnight on Monday 18 June for carriageway repairs. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly-signed diversion routes.

Planned Roadworks In Yorkshire And The Humber – Summary For Monday 18 June To Sunday 24 June 2018, 15th June 2018, 18:36 PM