search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber – Summary For Monday 30 July To Sunday 5 August 2018
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 27 July and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M18 junction 0 to M1 junction 32 Thurcroft

The M18 southbound to the M1 northbound link will be fully closed overnight for three nights from Monday 30 July. The closures will take place between 8pm and 6am and drivers will follow a clearly signed diversion route.

M18 junction 7 to M62 junction 35 Langha

The northeast link will be fully closed overnight on Monday 30 July for bridge work. The southeast link will be fully closed overnight for four nights from Tuesday 31 July for bridge work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 27 Gildersome

The westbound exit slip roads from the M62 and M621 will be reduced to one lane 24/7 for junction improvements. A reduced speed limit of 50mph will also be in place.

M62 junction 32 Castleford

The eastbound carriageway will be fully closed between the slip roads overnight on Monday 30 July for bridge work. The westbound carriageway will be fully closed between the slip roads overnight for two nights Tuesday 31 July for bridge work. The closure will take place from 8pm to 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 32a Holmefield to junction 33 Ferrybridge

The eastbound exit slip road at junction 33 will be fully closed overnight for five nights from Monday 30 July for barrier work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M180 junction 1 to junction 2 Woodhouse

The eastbound carriageway will be fully closed overnight on Monday 30 July. The westbound carriageway will be fully closed overnight on Tuesday 31 July. The eastbound and westbound carriageway has a 50mph speed restriction with a lane 1 closure 24/7 until December for barrier work.

A162 Ferrybridge

The southbound entry slip road will be fully closed from 6am on Monday 30 July until 8pm on Friday 31 August for barrier work. The closure will be 24/7 and drivers will be able to follow a clearly signed diversion route.

A64 Bilbrough to Askham Bryan

The eastbound and westbound carriageway has a 40mph speed restriction in place for carriageway repairs. The speed restriction is in place 24/7.

Planned Roadworks In Yorkshire And The Humber – Summary For Monday 30 July To Sunday 5 August 2018, 27th July 2018, 15:31 PM