search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber - Summary from Monday 22 January 2018
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 19 January and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M1 junction 32 Thurcroft

The northbound exit slip road will be fully closed overnight on Wednesday 24 January for technology works. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M1 junction 35 Thorpe Hesley

The southbound exit slip road will be fully closed overnight for two nights from Monday 22 January for survey works. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M1 junction 37 to junction 38 Haigh

The northbound carriageway will be fully closed for four nights from Monday 22 January with permanent lane 3 closures and narrow lanes in place until the end of January 2018 for drainage works. The southbound carriageway will be fully closed overnight on Friday 26 January for drainage works. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 32 Castleford to junction 30 Rothwell

The westbound carriageway will be closed between the slip roads at junction 30 overnight for two nights from Monday 22 January for the installation of concrete barriers. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. The eastbound and westbound carriageway will be in narrow lanes with 50mph speed restriction until March.

M62 junction 33 Ferrybridge to junction 34 Whitley

The westbound carriageway will be in narrow lanes with 50mph speed restriction until April for drainage work.

M62 junction 37 Howden

The westbound entry slip road will be fully closed overnight on Tuesday 23 January for barrier works. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes

M62 junction 26 to M606 junction 2 Euroway

The M606 southbound link to the M62 westbound will be fully closed overnight for five nights for bridge works. The eastbound carriageway will be closed between the slip roads on the M62 at junction 26 overnight on Wednesday 24 January and on the westbound carriageway the following night for bridge works. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M621 junction 3 Holbeck to junction 7 Stourton

The clockwise carriageway will be fully closed for five nights from Monday 22 January for carriageway improvement works. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A1M junction 36 to junction 37 Marr

The northbound and southbound carriageway will be fully closed overnight on Saturday 27 January for bridge works. The closures will take place between 9pm and 6am, and drivers will be able to follow clearly signed diversion routes.

Planned Roadworks In Yorkshire And The Humber - Summary from Monday 22 January 2018, 22nd January 2018, 22:30 PM