search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber – Summary For Monday 13 May To Sunday 19 May 2019
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 10 May and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M621 junction 7 Stourton to M1 junction 43 Rothwell

The clockwise carriageway will be fully closed overnight on Tuesday 14 May for barrier work and then again for two nights from Thursday 16 May. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. The clockwise carriageway will be in narrow lanes from M621 junction 6 to junction 7 with a 40mph speed restriction and the anticlockwise carriageway will be in narrow lanes from M621 junction 7 to junction 6 with a 50mph speed restriction until September.

M1 junction 41 Carr Gate

The northbound entry slip road will be fully closed overnight on Thursday 16 May for technology work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 26 Chain Bar

The eastbound entry slip road will be fully closed overnight on Tuesday 14 May for technology work. The closure will take place between 9pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 29 Lofthouse

The eastbound entry slip road will be fully closed overnight on Wednesday 15 May for technology work. The closure will take place between 9pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 36 to junction 37 Howden

The eastbound and westbound carriageways will be fully closed overnight on Tuesday 14 May. The closures for bridge work will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A1M junction 38 Redhouse

The southbound exit and entry slip roads will be fully closed overnight for two nights from Monday 13 May for carriageway improvement work. The closures will take place between 9pm and 6am, and drivers will be able to follow clearly signed diversion routes

A1M junction 37 to junction 36 Warmsworth

The southbound carriageway will be fully closed overnight for two nights from Thursday 16 May for carriageway improvements and the northbound carriageway will be fully closed overnight on Saturday 18 May. The closures will take place between 9pm and 6am, with a clearly signed diversion in place.

A1M junction 36 to junction 37 Marr

The northbound carriageway will be fully closed overnight on Wednesday 15 May for carriageway improvements. The closures will take place between 9pm and 6am, with a clearly signed diversion in place.

A63 Mytongate to South Coates

The eastbound and westbound carriageway will be fully closed overnight for five nights from Monday 13 May for junction improvements. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. The eastbound and westbound will be in narrow lanes and 30mph speed restriction in place 24/7 on Roger Millward Way until spring.

A63 Priory Way – Western Interchange

The westbound carriageway will be fully closed overnight on Thursday 16 May for barrier work. The closures will take place between 8pm and 6am, with a clearly signed diversion in place.

A628 Flouch to Salters Brook

The eastbound and westbound carriageway near Valehouse reservoir will have temporary traffic lights in place 24/7 until the end of June for wall repairs.

A631 / M1 juntion 34 Tinsley Viaduct Lower Deck

The southbound carriageway will be fully closed until summer for carriageway improvement work. Drivers will be able to follow clearly signed diversion routes.

Planned Roadworks In Yorkshire And The Humber – Summary For Monday 13 May To Sunday 19 May 2019, 11th May 2019, 9:00 AM