search
Barnsley
Batley
Bedale
Beverley
Bingley
Bradford
Bridlington
Brighouse
Castleford
Catterick Garrison
Cleckheaton
Cottingham
Darlington
Dewsbury
Doncaster
Driffield
Elland
Filey
Goole
Guisborough
Halifax
Harrogate
Hawes
Hebden Bridge
Heckmondwike
Hessle
Holmfirth
Huddersfield
Hull
Ilkley
Keighley
Knaresborough
Knottingley
Leeds
Leyburn
Liversedge
Malton
Mexborough
Middlesborough
Mirfield
Morley
Normanton
Northallerton
Ossett
Otley
Pickering
Pontetfract
Pudsey
Redcar
Richmond
Ripon
Rotherham
Saltburn-by-the-Sea
Scarborough
Selby
Settle
Sheffield
Shipley
Skipton
Sowerby Bridge
Stockton-on-Tees
Tadcaster
Thirsk
Todmorden
Wakefield
Wetherby
Whitby
Yarm
York
Planned Roadworks In Yorkshire And The Humber – Summary For Monday 18 March To Sunday 24 March 2019
The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 15 March and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M18 junction 2 Wadworth

The southbound exit slip road will be fully closed on Saturday 24 March 8am until noon on police request. Drivers will be able to follow clearly signed diversion routes.

M1 junction 39 Durkar

The northbound exit slip road and southbound entry slip road will be fully closed overnight for seven nights from Monday 18 March for the installation of a noise barrier. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. There will be a lane 1 closure in place 24/7 on the southbound entry and northbound exit with a 50mph speed restriction until April.

M62 junction 27 Gildersome

The M621 junction 27 anticlockwise exit slip road and M62 junction 27 westbound exit slip will be fully closed overnight for two nights from Monday 18 March for junction improvements. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. There will be narrow lanes with a 50mph until spring on the M621 junction 27 exit slip road and the M62 junction 27 exit slip road.

M62 junction 33 Ferrybridge

The A162 northbound entry and exit slip roads, the eastbound exit slip and westbound entry slips and the westbound side of the roundabout will be fully closed on Tuesday 19 March for survey work. The closure will take place between 1am and 6am, and drivers will be able to follow clearly signed diversion routes. The A162 southbound entry and exit slip roads, eastbound entry and westbound exit slip roads and the eastbound side of the roundabout will also be fully closed on Wednesday 20 March for survey work. The closure will take place between 1am and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 33 to junction 34 Whitley

The eastbound carriageway will be fully closed overnight on Sunday 24 March for carriageway improvements. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 30 Rothwell

The eastbound exit slip road will be fully closed overnight on Wednesday 20 March for technology work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 32a to junction 33 Ferrybridge

The A1M southbound to the M62 eastbound link road will be fully closed overnight for five nights from Monday 18 March for barrier work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M62 junction 37 Howden to A63 South Cave

The eastbound carriageway will be fully closed overnight for five nights from Monday 18 March for barrier work. The closures will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M180 junction 4 to junction 5 Barnetby

The eastbound carriageway will be fully closed overnight for five nights from Monday 18 March for carriageway improvement work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

M180 junction 3 to junction 1 Tudworth

The westbound carriageway will be fully closed overnight for five nights from Monday 18 March for carriageway improvement work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A63 Welton

The westbound entry slip road will be fully closed overnight for six nights from Tuesday 19 March for local authority work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A63 Welton

The westbound exit slip road will be fully closed overnight for two nights from Wednesday 20 March for local authority work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A63 Mytongate to South Coates

The eastbound and westbound will be in narrow lanes and a 30mph speed restriction in place 24/7 on Roger Millward Way until spring.

A63 Brighton Street

The westbound entry slip road will be fully closed overnight on Wednesday 20 March for survey work. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A64 Musley Bank

The westbound entry slip road will be fully closed overnight for five nights from Monday 18 March for carriageway improvements. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes.

A628 Flouch to Salters Brook

The eastbound and westbound carriageway will have temporary traffic lights in place 24/7 until the end of March for safety improvement work.

A616 Newton Chambers to Westwood

The eastbound and westbound carriageway will be fully closed overnight for three nights from Monday 18 March for carriageway improvements. The closure will take place between 8pm and 6am, and drivers will be able to follow clearly signed diversion routes. The westbound carriageway will have temporary traffic lights in place 24/7 with narrow lanes until the end of March for improvement work.

Planned Roadworks In Yorkshire And The Humber – Summary For Monday 18 March To Sunday 24 March 2019, 16th March 2019, 20:00 PM